ENERGY CHARGES (all rates):
MAY through SEPTEMBER:
First 250 kWh/kw per month (250 hours) at $0.054 per kWh
All additional kWh at $0.31 per kWh
JANUARY through APRIL and OCTOBER through DECEMBER:
All kWh at $0.14 per kWh (no demand charge)
OPTIONS for MAY, JUNE, & SEPTEMBER:
NO CONTROL - $8.50/hp per month plus energy.
Customer operated. No demand charge if used only 10:00 pm to 7:00
am MDT.
MASTER METERING - $15.80/hp per month
plus energy. Customer Controlled. This rate allaws the irrigator
to run pivots whenever needed. Most efficient way to use this rate
is to group three or more wells together. Midwest bills highest
15 minute measured demand each month for that group and divides
that demand among each well that ran "on peak." All wells can run
10:00 pm to 7:00 am MDT every day without counting against the peak.
Example: Six wells at 100 hp each. If only one well ran at any
one time on peak during the month: 100 hp * $15.80 / 600 hp = $2.63/hp
for each well. If three wells were run on peak at once: 300 hp
* $15.80 / 600 hp = $7.90/hp for each well.
3.5 DAY CONTROL - $4.50/hp per month plus
energy. Midwest will control three consecutive days per week (as
needed) plus every other Sunday (as needed). Assigned days will
be Monday, Tuesday, and Wednesday or Thursday, Friday, and Saturday.
No Control 10:00 pm to 7:00 am MDT.
EVERY DAY CONTROL - $2.00/hp per month
plus energy. Midwest will control any day needed (7:00 am to 10:00
pm MDT). No Control 10:00 pm to 7:00 am MDT.
OPTIONS for JULY & AUGUST:
NO CONTROL - $14.15/hp per month plus
energy.
ONE DAY CONTROL - $11.70/hp per month
plus energy. Midwest will control one assigned day per week as
needed (possibly 24 hours).
TWO DAY CONTROL - $9.25/hp per month plus
energy. Midwest will control two assigned days per week as needed
(possibly 48 hours).
YEARLY DISCONNECT OPTION:
Wells that will not be used for the season have the option of
being disconnected and only paying $8/hp for the year. Certain restrictions apply. Please call the office for details.
December billing - contract minimum check.
On Peak times for the months of May through September are 7:00am to 10:00pm MDT.
$15/HP contract minimum will be billed with usage for January through April (May bill).
There will be a 5% penalty on any irrigation services without capacitors.
All Horsepower will be calculated based on actual demand shown
by demand meter on a yearly basis = (KW x 1.34 = HP)
Note: Interest rate of 1.5% per month will be applied to any
previous balance less previous interest charges until paid.